Exciting progress is being made at the construction site. The foundations are currently being placed in the new addition of the school. The footings are dug into the ground, the reinforcing steel is placed, and then the concrete will be poured into the footings by a pump. The reinforcing steel and concrete will create the strength needed to support the building upon it. It will not be long before the structural steel and skeleton of the school goes up!